Preliminary
UN/EDIFACT ORDERS Message
Implementation and Test Plan
for the
DOD CALS IDE Project
March 1998
In support of
Contract DASW01-97-D-0006

LIST OF FIGURES
LIST OF TABLES
1.0 INTRODUCTION
1.1 Overview and Background
1.2 Approach
2.0 ARCHITECTURE FRAMEWORK MODEL FOR TESTING
3.0 TEST SCHEDULE
4.0 TEST METHODOLOGY
4.1 Testing Strategy
4.2 Assumptions and Constraints
4.3 Risk Assessment
4.3.1 Risk Identification and Impact
4.3.1.1 Communications/Network
4.3.1.2 Operational
4.3.1.3 Administrative
4.3.2 Control Objectives
4.4.1 Basic Functions
4.4.2 Data Format and Content
4.5 Test Results Analysis and Reporting
4.5.1 Data Analysis
4.5.2 Test Documentation
6.0 SUMMARY AND CONCLUSIONS
APPENDIX A: GLOSSARY
APPENDIX B: ABBREVIATIONS AND ACRONYMS
Figure 1.2-1 UN/EDIFACT ORDERS Message Prototype Testing Approach
Figure 1.2-2 Business Process Requirements Assessment Methodology
Figure 2.0-1 Electronic Purchasing Testing Architecture
Figure 2.0-2 UN/EDIFACT ORDERS Message Prototype Test Suite Matrix
Figure 2.1-1 Application Interface: Outbound
Figure 2.2-1 Transaction Generation: Outbound
Figure 2.3-1 Network Communications: Outbound/Inbound
Figure 2.4-1 Transaction Interpretation: Inbound
Figure 2.5-1 Application Interface: Inbound
Figure 4.2-1 ManTech Testing Agent DataFlow
Figure 5.2-1 Task 3 Architecture