|
|
Content of a Through Life Information
Management Plan
Purpose:
Based on the Through Life Information Managment Strategy, the TLIM Plan presents the
approach for acquiring, distributing, using, updating and archiving all of the information
needed to conduct programme lifecycle activities.
Content:
What do we have (background info):
- Program Strategy CALS (see Annex E)
- Description of the Program Business Environment and Options, incl.:
- plans (incl. overall project plan with milestones / schedule)
- roles through life
- programme participants and location
- IT Environment Assessment, incl.:
- identify relevant legacy systems
- identify relevant legacy data sources (specifically applicable to buying existing DS)
- IT policies and plans
What do we need (requirements):
User requirements (present / future):
Information requirements (present / future), based on interpretation and grouping of
user requirements:
- Definitions of information needed
- Management information
- Tech information
- Configuration Managemen
- Logistics Information
- Product Data
- Feedback for monitoring achievements
Economical / Legal Information
Envisaged use of information
Anticipated Life Cycle of the information
Form(s) of the information
Management of the requirements and the info itself
Infrastructure requirements (present / future):
- Policies
- Network Architecture
- Protocols
- Bandwidth
- Security (firewalls / encryption)
- Internet
- Computer architecture
- System Back-up
- Physical Media
- Output Devices
- Computer Graphics and Monitors
- Input Devices
- Operating System
- Database
- Workflow
- CAD/CAM
- Product Data Management
- Documentation
- LSA
- GroupWare
- EDI
- Internet
- Email
- Bulletin Board
- NATO CALS Data Model
- PLCS Data Model
- NATO Stock Numbering
- CALS Standards
- IETM
- Express/STEP
- EDIFACT
- Bar Coding
How to provide (plans/output):
- Information Policy (further refinement of
PSC)
- Security
- Contract Strategy for information and infrastructure
- Information Upgrade plan (e.g. relationship with legacy information
(digitise paper
sources / convert and import existing digital info / link to existing digital info without
conversion)
- Infrastructure Upgrade plan
- Information portability /transition plan
- Sustainment plan
- Info Service
- Cultural /change plan
- Risk Management plan
Review plan for the IMP:
- When is the next review of this TLIMP
- At certain date (e.g. one year after last issue)
- As result of certain events (e.g. after change of ownership of the DS)
- What is to be reviewed
- Everything
- Specific parts
|